Maintenance:
- 09: Steam cleaned carpets, Clean bottom, New Battery installed.
- 08: Buff and wax above rubrail, Oil and gear lube changed, Clean Bottom, Replace bow navigation light, New speedo tube installed, Grease u-joints and check engine alignment, Replace water pump impeller, Tuned up as needed.
- 07: Oil and gear lube changed, Clean Bottom, Installed new battery.
- 06: Buff and wax, Oil and gear lube changed, Clean Bottom.
- 05: Buff and wax, Greased u-joints and check engine alignment, Oil and gear lube changed, Clean Bottom.
- 04: Buff and Wax, Installed new water pump impeller.

